Rig Mobilization Readiness Board
Combines equipment inspections, required documents, open maintenance and customer requirements into one evidence-backed mobilization board with explicit holds.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
A rig can appear available while an inspection, document, maintenance item or customer-specific requirement is still open. Mobilization decisions are delayed or made without one complete evidence view.
How It Works
- Builds a job-specific readiness checklist from the customer requirements and approved rig configuration.
- Connects inspection status, documents, open maintenance and technical holds to each checklist item.
- Shows ready, blocked and missing-evidence items with owners; qualified Operations staff retain release authority.
What It Removes
- Availability treated as proof of readiness
- Open maintenance and document holds tracked separately
- Mobilization release without an accountable exception owner
Input Data RequirementsCustomer requirements, rig configuration, inspection records, required documents, open work orders, technical holds
Output FormatMobilization readiness board with evidence, open holds, owners and release status
“A rig is not ready because it is available; show me the evidence required to release it.”