Marine & Mobilisation Logistics
Schedules supply vessels across rig clusters and plans rig moves and mobilisation at least cost under weather scenarios.
8-12Build Duration
60-100x+Indicative ROI
The Challenge
Strategic rig moves and multi-rig basin operations are planned manually. Vessel trip-days are wasted and weather disruption is absorbed with no optimisation.
How It Works
- Reads weather forecasts, vessel rosters and basin bathymetry across the rig clusters.
- Routes vessels within time windows and minimises move cost over tow methods and weather.
- Delivers vessel schedules and least-cost move plans to marine and rig-move planners.
What It Removes
- Manual planning of multi-rig basin logistics
- Wasted supply-vessel trip-days
- Weather disruption absorbed without a plan
Input Data RequirementsWeather forecasts, vessel rosters, basin bathymetry, rig-move schedules, tow-method and route options
Output FormatOptimised supply-vessel schedule, least-cost rig-move and mobilisation plan, weather-window recommendations
“The vessels run fewer trips for the same work, and a move plan survives the weather.”