UC-479
Improve Drill Pipe and Tubular Life to reduce downtime and extend asset life
Fills the Fleet page: every string, the life it has left, and where it should work next.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
The opportunity is to eliminate Pipe retired by the calendar, hard wells on tired strings, and a charge nobody saw coming. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.
How It Works
- One engine tracks every joint and every string by rotating hours, torque and drag, dogleg exposure, inspection history and the wells it has been in.
- It predicts which strings are near the end of their life, recommends moving them between rigs so wear is spread instead of piled on one string, and tells the buyer what to order and when.
- Routes the source-linked result to the named owner for review and action.
What It Removes
- Pipe retired by the calendar
- Hard wells on tired strings
- A charge nobody saw coming
Input Data RequirementsRelevant operational records, contracts, transactions, schedules, documents and outcome history named in the source proposal
Output FormatDashboard showing every string, the life it has left, and where it should work next.
“I know which string has the hours left for that well, before it ships.”
