UC-484
Improve Shipyard Scope Sizing to reduce cost, risk and delay
Fills the Maintenance page: the survey scope, priced from condition, not from the last one.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
The opportunity is to eliminate a scope copied from the last one, calendar work on healthy equipment, and out of service days nobody challenged. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.
How It Works
- One engine reads condition data from the control systems, the maintenance management system, manufacturer life limits and survey requirements.
- It separates what the class society requires from what the calendar assumes, sizes each shipyard and special periodic survey scope from measured condition, and shows the evidence behind every line the scope adds or removes.
- Routes the source-linked result to the named owner for review and action.
What It Removes
- A scope copied from the last one
- Calendar work on healthy equipment
- Out of service days nobody challenged
Input Data RequirementsRelevant operational records, contracts, transactions, schedules, documents and outcome history named in the source proposal
Output FormatDashboard showing the survey scope, priced from condition, not from the last one.
“The scope is built from what the equipment is telling us, not from last time.”
