UC-472
Optimise Bit Run and Repair to reduce downtime and extend asset life
Fills the Products page in PTEN LENS: every bit run, its dull grade, and whether it comes back repairable.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
The opportunity is to eliminate a repair bill found at quarter end, the same dull on the same formation, and a design changed without the runs. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.
How It Works
- One ledger links every bit design, serial number, run, formation, parameter set, dull grade and repair outcome.
- It predicts which design in which application returns repairable and which returns scrap, flags the run before the damage is done, and reads the dull photographs first pass for the engineer to confirm.
- It feeds the three to six day design to field loop with what actually happened downhole.
What It Removes
- A repair bill found at quarter end
- The same dull on the same formation
- A design changed without the runs
Input Data RequirementsAsset register, telemetry, work orders, inspection history, failure records, parts usage and operating schedules
Output FormatDashboard showing every bit run, its dull grade, and whether it comes back repairable.
“I know which bit comes back repairable before I send it out.”
