UC-993
Yield Ledger. Where the tonne went.
The ledger follows every tonne of hot rolled coil from receipt to the day the prime coil ships, and puts a name on each loss along the way.
12 weeksBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
$XXXK/yrValue
The Challenge
SAP records what steel went in and what prime coil came out. It does not say what happened in between. Losses to crop, trim, off-gauge, visual defects and transition coils are known in total and not by cause, so the same loss repeats because nobody named it. Published cold-rolling loss runs at 3 to 5 per cent.
How It Works
- Reads and connects the source records named in the proposal.
- The ledger follows every tonne of hot rolled coil from receipt to the day the prime coil ships, and puts a name on each loss along the way. It ranks losses by cause, grade, supplier lot and line condition, flags the week a line's yield drifts with the coils behind it, and writes the Operations Head a short weekly note. Per-supplier-lot yield goes to procurement. This is the fastest build in the pack: it reads SAP records that already exist.
- Publishes a source-linked recommendation for Operations Head approval and records the decision.
What It Removes
- Loss known in total, never by cause
- The same loss repeating each month
- Supplier lots nobody ranks
Input Data RequirementsOperational, financial and reference records named in the agis proposal for Yield Ledger. Where the tonne went..
Output FormatYield Ledger. Where the tonne went. decision view with ranked actions, source links, confidence and a named owner.
“I get one page on Monday that says where last week's tonnes went, and why.”
