UC-224
Shop-Floor Throughput Optimiser
Sequences panel jobs across work centres, wiring teams and test bays to ship on time - and what-ifs capacity before orders are taken.
18Build Duration
6-12xIndicative ROI
The Challenge
Engineer-to-order lead times run 12-18 months, scarce wiring and FAT labour bottleneck throughput, and capacity planning across one 10,000 sqm shop is manual. On-time delivery decides repeat awards.
How It Works
- Ingests job records, routings, the order book and labour/test-bay capacity.
- MILP/CP-SAT job-shop scheduling with ML-learned task durations minimises tardiness.
- Issues the optimised build schedule, daily dispatch list and intake what-ifs.
What It Removes
- Manual capacity planning
- FAT and test-bay bottlenecks
- Headcount-proportional scaling
Input Data RequirementsJob records and routings, due dates and order book, labour and test-bay capacity, station-level timings
Output FormatOptimised build schedule, daily dispatch list, capacity what-ifs, bottleneck alerts
“It plans which panel gets built where and when, so jobs ship on time and the shop makes more without more space or people.”
