UC-781
Hold One Interface and Handover Register Across the Project
Keeps every interface between drilling, subsea, marine and operations on one register with an owner and a handover date.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
Interfaces are agreed in meetings between two parties and recorded in each party's own minutes. When a handover slips, the other side often finds out at the next meeting, and no single register shows what is outstanding across the project.
How It Works
- The engine holds every interface with both parties, the deliverable, the date and the acceptance criteria.
- It tracks each one against the project schedule and flags a slip to both sides as soon as it appears.
- It produces the handover pack when the interface is met and records the acceptance.
What It Removes
- Interfaces recorded in two sets of minutes
- Handover slips discovered at the next meeting
- No single view of what is outstanding across parties
Input Data RequirementsInterface agreements and meeting minutes, project and drilling schedules, deliverable registers, contractor and vendor commitments.
Output FormatOne interface register with owners and dates, slip alerts to both parties, and a handover pack per completed interface.
“One register, and both sides are looking at the same one.”
