UC-231
LNG Build Schedule & Cost-Risk Watchdog
An always-on agent over the EPC schedule, procurement and module fabrication that flags slip and overrun risk with document citations.
TBDBuild Duration
TBDIndicative ROI
The Challenge
On a terminal build, schedule slip and cost overrun directly erode returns, module fabrication and long-lead equipment are schedule-critical, and manual project controls surface problems too late to act.
How It Works
- Ingests the EPC schedule, procurement status, contracts and daily reports.
- ML predicts slip and overrun; RAG grounds every flag in the source documents.
- Publishes ranked alerts, what-if scenarios and a weekly board-ready risk view.
What It Removes
- Late manual project-controls reporting
- Uncited risk claims
- Change-order surprises
Input Data RequirementsEPC schedule and progress, procurement and long-lead status, module fabrication status, contracts, change orders, daily reports
Output FormatRanked slip/overrun alerts with citations, what-if schedule scenarios, weekly board-ready risk view
“An always-on watchdog on the terminal build that warns - with the paperwork to prove it - when something is about to slip.”