Platform AssureLens AccioLens UXLens App Monitoring Industries Energy & Industry Financial Services Retail & eCommerce SMB - Small & Mid-Sized Business Company About Us Team Blog In the News Careers Contact Us Build your AI Blueprint Español
Industry · OIL & GASFunction · Operations
UC-685

Improve Barrel of Water to increase output and recover lost value

One board: every water barrel routed, every permitted daily cap, every pond against the frac.

TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue

The Challenge

The opportunity is to eliminate a barrel trucked past a pipeline, a permit headroom nobody watched, and a frac short of recycled water. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.

How It Works

  • The engine routes each battery's water daily to the cheapest permitted outlet given permitted maximums, pressure trend, trucking against pipeline, seismic response status and contract minimums, and forecasts water supply against the frac schedule so the recycled share is known before it locks.
  • Engine 03 prices well level loss; this one prices a permit driven area curtailment.
  • Engine 06 works air and LDAR; this one works injection.

What It Removes

  • A barrel trucked past a pipeline
  • A permit headroom nobody watched
  • A frac short of recycled water
Input Data RequirementsRelevant operational records, contracts, transactions, schedules, documents and outcome history named in the source proposal
Output FormatOne board: every water barrel routed, every permitted daily cap, every pond against the frac.
“Where does this barrel go today, and how much headroom is left on that permit?”
SwarmLens · Public Use-Case Library

← Back to all use cases