UC-672
Improve Cargo to reduce cost, risk and delay
One board: every committee ahead, with the Kosmos position and the dollars on it.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
The opportunity is to eliminate a cash call with no AFE line, a cost recovered by assumption, and a carry with no repayment date. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.
How It Works
- For every technical and management committee the pack reads the operator data pack, the 4D and OBN interpretation, well history, prior minutes and the commitments register, then writes the Kosmos position: what to challenge, what to vote, and the dollars on each.
- It ranks infill targets so the well order can be argued, not accepted.
- This engine takes which well is drilled and when; the Injection and Uptime Watch takes how the wells already drilled perform.
What It Removes
- A cash call with no AFE line
- A cost recovered by assumption
- A carry with no repayment date
Input Data RequirementsRelevant operational records, contracts, transactions, schedules, documents and outcome history named in the source proposal
Output FormatOne board: every committee ahead, with the Kosmos position and the dollars on it.
“Is this bill right, and when does the carry actually come back?”
