UC-649
Manage Air Permit and Compliance to reduce risk and stay compliant
One board: every permit, APEN and deadline against the schedule that waits on it.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
The opportunity is to eliminate a pad planned on an optimistic date, a lab result nobody checked, and a deadline found late. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.
How It Works
- The engine holds every APEN, permit condition, Subpart W source and filing deadline on the spine, models the DJ queue so the drilling schedule is built against realistic approval dates, prepares each recurring calculation and filing, and runs integrity checks on contractor environmental results before they are filed, as the ECMC consent order of 24 June 2026 requires.
- Once a permit is granted, the schedule it feeds belongs to engines 05 and 03.
- Routes the source-linked result to the named owner for review and action.
What It Removes
- A pad planned on an optimistic date
- A lab result nobody checked
- A deadline found late
Input Data RequirementsApplicable obligations, permits, evidence records, deadlines, approvals, exceptions and audit history
Output FormatOne board: every permit, APEN and deadline against the schedule that waits on it.
“Show me every permit my next twelve DJ pads wait on, and where each sits in the queue.”