UC-663
Plan Allocation and Filing to reduce risk and stay compliant
One board: every property, the allocated volume, the exception, the filing due.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
The opportunity is to eliminate a volume two systems dispute, a meter overdue for proving, and a filing built on a stale map. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.
How It Works
- The engine compares ProCount allocated volume against meter, ticket and statement volume by property daily, ranks each exception by dollar exposure and names the cause.
- It pre-validates every return before submission and flags each well whose PetroRegs mapping changed since the last filing.
- Engine 03 takes price, deduction and destination after the barrel leaves the lease; this engine takes the volume before it.
What It Removes
- A volume two systems dispute
- A meter overdue for proving
- A filing built on a stale map
Input Data RequirementsApplicable obligations, permits, evidence records, deadlines, approvals, exceptions and audit history
Output FormatOne board: every property, the allocated volume, the exception, the filing due.
“Whose barrel is this, and which system is telling me the wrong number?”
