UC-1036
BHA Requirements & Compatibility Workbench
Reconciles well requirements, tool limits, survey needs and BHA interfaces around approved calculations before mobilization.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
Job requirements, tool operating limits, survey needs and assembly interfaces must all agree before mobilization. The planning review is vulnerable when those constraints are split across documents and product records.
How It Works
- Extracts requirements and survey needs from the approved well and service programme.
- Connects current product envelopes, interfaces and approved BHA calculations to the proposed assembly.
- Flags incompatibilities and missing evidence for engineering review; it does not replace approved planning software or authority.
What It Removes
- Compatibility checks performed in disconnected worksheets
- Tool-limit exceptions found during mobilization
- Planning assumptions without the approved calculation or product envelope
Input Data RequirementsWell programme, service requirements, survey plan, approved BHA calculations, tool and product envelopes, interface specifications
Output FormatRequirements and compatibility workbench with cited exceptions and engineering disposition
“Show me where the planned BHA and the current tool limits do not agree before we mobilize.”
