UC-1035
Downhole Tool Dispatch Readiness
Reconciles tool serial, configuration, test status, location and reservation to detect wrong or unready downhole tools before dispatch.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
Tool location alone does not establish readiness. A tool can be at the right base but have the wrong configuration, incomplete tests or a conflicting reservation for the planned job.
How It Works
- Resolves the requested tool and planned job requirements to the approved serial and configuration record.
- Checks current location, configuration, test status, maintenance hold and reservation against the dispatch request.
- Presents ready and exception items for dispatch approval, with the evidence and owner for every blocker.
What It Removes
- Dispatch decisions based on location alone
- Wrong configuration found after loading or arrival
- Test and reservation exceptions checked in separate systems
Input Data RequirementsDispatch request, job requirements, tool serial and configuration, location, test status, maintenance holds, reservations
Output FormatDispatch readiness list with wrong-tool and unready-tool exceptions, evidence and owner
“Before the truck leaves, show me that the exact tool is configured, tested and reserved for this job.”
