UC-606
Improve Field Gas and CNG Supply to reduce cost, risk and delay
Fills the fuel page: every pad, the cheapest compliant gas for it, and the treating cost behind it.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
The opportunity is to eliminate a pad fuelled the expensive way, trailers where a line was cheaper, and a source chosen without a price. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.
How It Works
- For every pad the engine prices field gas, CNG and LNG against each other: treating cost, line build, trailer count, methane number delivered, and the substitution each option supports.
- It reads the gas analysis, the compression schedule and the frac calendar, then commits the source before the fleet arrives.
- When a campus and a fleet want the same molecule it prices both and routes it to the better one.
What It Removes
- A pad fuelled the expensive way
- Trailers where a line was cheaper
- A source chosen without a price
Input Data RequirementsRelevant operational records, contracts, transactions, schedules, documents and outcome history named in the source proposal
Output FormatDashboard showing every pad, the cheapest compliant gas for it, and the treating cost behind it.
“I choose the source before the fleet arrives, and I can show what the other option would cost.”
