UC-731
Improve Job Design Selection to reduce errors and rework
The tool string and job programme chosen from what worked in comparable wellbores.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
The opportunity is to eliminate job designs built from the last job rather than the best one, tool strings chosen without comparable well evidence, and failed runs repeated because the outcome was never fed back. The proposed workflow is source-linked, but the current operating baseline and financial value remain illustrative until validated with the client.
How It Works
- Indexes past job programmes, tool strings, wellbore conditions and run outcomes.
- Matches the new well to comparable wellbores and ranks the tool string options.
- Records the outcome against the prediction and updates the design library.
What It Removes
- Job designs built from the last job rather than the best one
- Tool strings chosen without comparable well evidence
- Failed runs repeated because the outcome was never fed back
Input Data RequirementsJob programmes and tool string records, wellbore and hole condition data, run outcomes and failure reports, customer well files
Output FormatRanked tool string options with comparable well evidence, job programme draft, outcome against prediction
“Which string actually worked in a hole like this one?”
