UC-340
Photo-Verified Fit-Out Progress & Claim Pack
Measures how complete each compartment really is from ordinary phone photographs, checks the fire grade fitted and builds the claim pack.
TBDBuild Duration
XXXXIndicative ROI
XXXXBuild Cost
XXXXValue
The Challenge
Payment is released against measured completion, yet that measurement is a judgement made in a meeting. Fire grades look identical and differ only by a printed number, so the wrong one hides behind lining.
How It Works
- Takes photographs from the walk a supervisor already does, plus drawings and the expected list.
- Measures real completion per compartment, flags wrong work and verifies the fire grade fitted.
- Writes the evidence in the yard's claim format and keeps the photographs as the record.
What It Removes
- Completion settled as a judgement in a meeting
- Wrong fire grade found only at survey
- Claim packs assembled from memory after the fact
Input Data RequirementsPhone photographs from the existing supervisor walk, compartment drawings and expected item list, supplier fire-rating certificates, completion stages
Output FormatPhotograph-backed completion per compartment, defect list with photo and location, fire-grade verification, claim pack in the yard's format
“Work that has not been measured has not been invoiced - and now the measurement arrives with the photograph attached.”
